Bromsgrove | Redditch | Wyre Forest
North Worcestershire Water Management
Water management advice for larger applications
Guidance note on the production of a Sustainable Drainage System Strategy (SuDS)
What is a Sustainable Drainage System Strategy (SuDS)?
A SuDS Strategy is a comprehensive plan that outlines how surface water will be managed to replicate natural drainage processes, rather than relying solely on conventional drains and sewers. It aims to manage surface water sustainably while reducing flood risk, improving water quality, and enhancing environmental and social benefits in urban developments. These plans are required under Annex C of the National Planning Policy Framework; however, if you do not include a SuDS Strategy for your development, you will need to provide the Local Planning Authority with clear evidence of why their use would be inappropriate. Templates for designing your SuDS Strategy can be found on the Planning Portal website.
Who should read this?
Anybody who is intending to apply for planning permission where water will be used and/or disposed of. North Worcestershire Water Management (NWWM) has developed two pages - one for household applications and one for larger applications. This one deals with larger applications, defined as any application involving more than one property.
When to submit a SuDS Strategy?
A SuDS Strategy should be submitted simultaneously with the planning application, or you could also decide to submit it prior to this. The implementation of this strategy should be considered at the earliest stages of development, as it is harder to add SuDS in the later stages of the planning process.
Who to submit it to?
You should include your SuDS Strategy within your planning application when you submit it to the relevant Council. Alternatively, you can submit it directly to NWWM.
A SuDS Strategy should accompany all planning applications where water will be used and/or disposed of. This strategy will assist in co-ordinating between regulatory authorities across North Worcestershire in the resolution of water management with the following main aims:
- minimising flood risk;
- managing surface water;
- achieving sustainable drainage principles in new and existing development;
- incorporating appropriate water management techniques into new development;
- ensuring priority is given to the re-use and recycling of water;
- ensuring new development negates any adverse effects on the water cycle, supply and quality;
- establishing the life-long maintenance and management responsibilities for all water management facilities;
- restricting the developed rate of surface water run-off;
- requiring the provision of water harvesting, saving and recycling devices in new development;
- and maximising biodiversity gain from both Sustainable Drainage Systems (SuDS) and open space areas incorporated into new development.
What are examples of SuDS techniques?
The proposals within the SuDS Strategy should follow best-practice guidance from the National Standards for Sustainable Drainage Systems (2025) and the relevant local SuDS Design & Evaluation Guides. They should also be designed to be multi-purpose, providing benefits for the Four Pillars of SuDS: Quantity, Quality, Amenity, and Biodiversity. There are a number of techniques that can be applied to help manage water, as a result of development, including:
- A SuDS management train, comprising a variety of at-surface SuDS features, which provide a sustainable solution to help reduce and manage surface water, flooding, and pollution. These are systems created to receive surface water run-off and provide drainage solutions that mimic natural processes rather than piped solutions(e.g. ponds, wetlands, detention basins, underground storage, swales, filter and infiltration trenches, filter strips and permeable surfaces). The Council will require the provision of SuDS techniques in all householder proposals that involve changes to a sites drainage characteristic, in order to minimise the impact of surface water run-off from the site. Details on SuDS techniques can be found in the CIRIA publication ‘The SUDS Manual (C697)’ available from their website: www.ciria.org.
- Rainwater harvesting is considered a priority in the drainage hierarchy set out in Standard 1.2 of the National Standards for Sustainable Drainage Systems. The technique is described as collecting water from roofs and directing it to either water butts, above or underground tank(s). This water is then pumped on demand direct to toilets, washing machine and outside taps.
Greywater recycling is defined as the re-use of water from the bath, shower and wash hand basin. The ideal situation for greywater is in living accommodation where sufficient amounts are generated daily for reuse in toilets, the washing machine and any outside tap.
Requirements for larger applications
| Development type | Measures to consider | Reason |
|---|---|---|
| Two to ten house development | Rainwater harvesting to capture roof water discharge for non-drinkable water use; water butts on downpipes; low water use appliances (dual flush toilets, permeable paving etc.); water attenuation measures (swales, detention & retention basins);multi-functional spaces (open park spaces). | To reduce surface water discharge; to encourage surface water recycling; to reduce fresh water usage; to control the flow of water during storm events; to create amenity with floodplain space when required. |
| 11 or more houses | Rainwater harvesting to capture roof water discharge for non-drinkable water use; water butts on downpipes; low water use appliances (dual flush toilets, permeable paving etc.), water attenuation measures(swales, detention and retention basins, storm water attenuation tanks if necessary), multi-functional spaces (open park spaces). | To reduce surface water discharge; to encourage surface water recycling; to reduce fresh water usage; to control the flow of water during storm events; to create amenity with floodplain space when required. |
Other requirements
Consent
Consent may be required for works, irrespective of whether temporary or permanent, where the flow of a watercourse is likely to be affected. The Environment Agency provides consent for works in a Main River, and NWWM provides consent for works in an Ordinary Watercourse. The process takes 8 weeks at a fee of £50. The consenting authority will screen the application to determine if a Water Framework Directive assessment (or other such assessment) is required. Enforcement action may be taken for any damaging or potentially damaging works which have been undertaken either without consent or are in contravention of an issued consent.
A Site-Specific Flood Risk Assessment (FRA)
A site-specific flood risk assessment will also be required for planning applications relating to areas of flood risk. This will depend on the size, type and location of the development. The objectives of a FRA are to determine whether a proposed development is likely to be affected by current or future flooding from any source; whether it will increase flood risk elsewhere; whether the measures proposed to deal with these effects and risks are appropriate; and whether the development will be safe. FRAs come in three levels depending on the scale and nature of the development (Level 1 –Screening study, Level 2 –Scoping study & Level 3 –Detailed study). For more information on FRAs, please visit the Environment Agency or refer to the National Planning Policy Framework document.
A checklist for larger planning applications
Before submitting your application, you might want to read through this checklist to assure yourself that all of the required information for your development’s SuDS Strategy has been adequately covered. This will help to evaluate your application and increase the chance of it getting approved.
- Have you included details about the level of flood risk to your proposed development & included a FRA if required?
- Have you included details to demonstrate that your proposed development will not create or exacerbate flooding on or off site?
- Have you included details about how you are proposing to dispose of foul and surface water?
- Have you introduced SuDS techniques where possible? (If it has not been possible to drain surface water through the ground, it is necessary to look at the potential possibility of draining it to a watercourse or a surface water sewer).
- If a soakaway is a considered measure, proof of a porosity test with accompanying calculations to prove its capability will be required.
- Does the design incorporate facilities to collect, store and use rainwater and/or greywater?
- Do your landscaping schemes and planting design plans for the site minimise the need for watering?
- Has the effect of the development on the quality and quantity of run-off from the site been considered?
If there is any aspect of this that you are unsure about, please do not hesitate to contact North Worcestershire Water Management for further advice and information, and we will respond within 21 days. We do not charge for pre-application advice or consultation on SuDS Strategies.
Email: enquiries@nwwm.org.uk
Telephone: 01562 732191 (Monday to Friday, 9am - 5pm)